Department · Technical design and regulatory coordination
Design & Approvals
ডিজাইন ও অনুমোদন
Architecture, structural and MEP design, interiors, and coordination of RAJUK, Fire Service and CAAB submissions — tracked as separate milestones.
The problem
“Design it and make the application package approval-ready.”
What BEST ABASHON does
- Architectural, structural and MEP design
- Planning and development feasibility
- Interior design and fit-out
- 3D visualization
- RAJUK LUC / Construction Permit / Occupancy Certificate coordination
- Fire Service and CAAB coordination where applicable
What we do not guarantee
- We never promise or “guarantee” an approval. Decisions belong to RAJUK, Fire Service, CAAB and other authorities.
From land to handover
The development lifecycle, under one case
- 1Intake & feasibilityWhat can be built, and is it worth it?Project Management
- 2Due diligenceDocuments, records, site and survey.Due Diligence
- 3DesignArchitecture, structure and MEP, coordinated.Design & Approvals
- 4ApprovalsRAJUK LUC → Construction Permit; Fire, CAAB where needed.Design & Approvals
- 5Budget & tenderBOQ, bids compared like-for-like, award.Project Management
- 6ConstructionBuilt to issued drawings with QA and safety.Construction
- 7Handover & aftercareTesting, snagging, as-builts, Occupancy Certificate.Construction · PM
Process
- Brief and site / document intake
- Zoning and development feasibility
- Concept design and client sign-off
- Architectural development
- Structural and MEP coordination
- Submission checklist
- Application coordination
- Authority query and revision management
- Approved / accepted documentation
- Construction issue set
Deliverables
- Site and design brief
- Concept drawings
- Architectural set and coordinated engineering set, according to scope
- Submission register and document checklist
- Authority correspondence log and revision register
- Construction drawing package
Documents normally requested
- Ownership and land documents
- Survey drawing
- Client programme and design brief
- Previous approvals, if any
- Utility and site data
Copies only, through the secure method we send after your case is created.
Internal timeline
- Concept: about 1–2 weeks for ordinary small projects
- Coordinated full design: about 4–12+ weeks depending on complexity
- Authority review time is excluded from any BEST ABASHON completion time
External dependencies
- RAJUK review and decisions
- Fire Service and CAAB review where applicable
These are outside our control and are not part of our service-level targets.
Fees
Every engagement gets a written quotation with scope, deliverables, internal timeline, fee and exclusions before any work starts. Standard quotations are sent within 24 hours. Government and statutory fees, third-party professional fees and authority decision time are excluded unless the quotation says otherwise.
Related official resources
Regulatory information last reviewed: 26 October 2026. Always verify current authority requirements before submission.
Services in this department
Architectural Design
Concept through construction drawings, with controlled revisions and sign-offs.
Learn more →Structural Design
Structural engineering to BNBC 2020 by qualified engineers.
Learn more →Interior Design
Space planning, interior design and fit-out coordination.
Learn more →RAJUK Approval Assistance
Approval-ready drawings and coordination of Land Use Clearance, Construction Permit and Occupancy Certificate.
Learn more →Fire & CAAB Clearance
Coordination of Fire Service e-Fire License and CAAB height clearance where applicable.
Learn more →Start your case
Tell us the outcome you want. We will route your case to the right specialist.