Department · Execution

Construction & Engineering

নির্মাণ ও প্রকৌশল

Residential and commercial construction, renovation, MEP and fire-system works delivered against an issued design, a BOQ and a baseline programme.

The problem

“Build or improve my property correctly.”

What BEST ABASHON does

  • Residential and commercial building construction
  • Civil and structural execution
  • Renovation and remodeling
  • Electrical, plumbing, sanitary, water and drainage
  • Fire-system implementation
  • Material sourcing and construction supervision

What we do not guarantee

  • We do not mobilize without a signed contract, an issued design and a baseline programme.
  • We do not publish a universal per-square-foot price — specification drives cost.

From land to handover

The development lifecycle, under one case

  1. 1Intake & feasibilityWhat can be built, and is it worth it?Project Management
  2. 2Due diligenceDocuments, records, site and survey.Due Diligence
  3. 3DesignArchitecture, structure and MEP, coordinated.Design & Approvals
  4. 4ApprovalsRAJUK LUC → Construction Permit; Fire, CAAB where needed.Design & Approvals
  5. 5Budget & tenderBOQ, bids compared like-for-like, award.Project Management
  6. 6ConstructionBuilt to issued drawings with QA and safety.Construction
  7. 7Handover & aftercareTesting, snagging, as-builts, Occupancy Certificate.Construction · PM

Process

  1. Technical intake and site review
  2. Design and scope freeze
  3. BOQ and cost plan
  4. Contract
  5. Mobilization
  6. Procurement and material submittals
  7. Construction with QA/QC and safety control
  8. Measurement and payment certification
  9. Testing and commissioning
  10. Snagging, as-built drawings and handover

Deliverables

  • Scope matrix and BOQ
  • Baseline schedule and procurement schedule
  • Material submittals and method statements
  • Daily logs and weekly reports
  • Measurement sheets and variation register
  • QA records and test results
  • As-built drawings, warranty and O&M handover package

Documents normally requested

  • Approved / issued design set
  • Ownership or authorization evidence
  • Applicable approvals
  • Geotechnical / structural information where needed
  • Client specifications and budget

Copies only, through the secure method we send after your case is created.

Internal timeline

  • BOQ / pre-construction: about 1–3 weeks after complete design
  • Execution: stated in the project’s baseline programme, not as a generic promise

External dependencies

  • Authority approvals
  • Site access and utility connections
  • Client decisions on specification and variations

These are outside our control and are not part of our service-level targets.

Fees

Every engagement gets a written quotation with scope, deliverables, internal timeline, fee and exclusions before any work starts. Standard quotations are sent within 24 hours. Government and statutory fees, third-party professional fees and authority decision time are excluded unless the quotation says otherwise.

Related official resources

Regulatory information last reviewed: 26 October 2026. Always verify current authority requirements before submission.

Services in this department

Start your case

Tell us the outcome you want. We will route your case to the right specialist.

A few more details (optional, helps us respond faster)

Please do not upload or paste identity or title documents here.

Thinking about a property? Verify it first.

Tell us the outcome you want — we open a case, name an owner and reply within 2 business hours.