Design & Approvals

Structural Design

স্ট্রাকচারাল ডিজাইন

Structural engineering to BNBC 2020 by qualified engineers.

The problem

Structural design is a safety decision, not a drafting task.

What BEST ABASHON does

  • Structural analysis and design
  • Coordination with architecture and MEP
  • Construction-stage queries

What we do not guarantee

  • We never promise or “guarantee” an approval. Decisions belong to RAJUK, Fire Service, CAAB and other authorities.

Who this is for

  • New buildings
  • Vertical extensions
  • Structural alterations

Process

  1. Brief and site / document intake
  2. Zoning and development feasibility
  3. Concept design and client sign-off
  4. Architectural development
  5. Structural and MEP coordination
  6. Submission checklist
  7. Application coordination
  8. Authority query and revision management
  9. Approved / accepted documentation
  10. Construction issue set

Deliverables

  • Structural drawings
  • Design basis

Documents normally requested

  • Ownership and land documents
  • Survey drawing
  • Client programme and design brief
  • Previous approvals, if any
  • Utility and site data

Copies only, through the secure method we send after your case is created.

Internal timeline

  • Stated per scope

External dependencies

  • RAJUK review and decisions
  • Fire Service and CAAB review where applicable

These are outside our control and are not part of our service-level targets.

Fees

Every engagement gets a written quotation with scope, deliverables, internal timeline, fee and exclusions before any work starts. Standard quotations are sent within 24 hours. Government and statutory fees, third-party professional fees and authority decision time are excluded unless the quotation says otherwise.

Related official resources

More from Design & Approvals

Start your case

Tell us the outcome you want. We will route your case to the right specialist.

A few more details (optional, helps us respond faster)

Please do not upload or paste identity or title documents here.

Thinking about a property? Verify it first.

Tell us the outcome you want — we open a case, name an owner and reply within 2 business hours.