Construction & Engineering

MEP Engineering

ইলেকট্রিক্যাল ও প্লাম্বিং

Electrical, plumbing, sanitary, water and drainage design and execution.

The problem

Late MEP coordination is one of the most expensive sources of rework.

What BEST ABASHON does

  • MEP design and BOQ
  • Coordination with architecture and structure
  • Execution, testing and commissioning

What we do not guarantee

  • We do not mobilize without a signed contract, an issued design and a baseline programme.
  • We do not publish a universal per-square-foot price — specification drives cost.

Who this is for

  • New buildings
  • Renovations
  • Commercial fit-outs

Process

  1. Technical intake and site review
  2. Design and scope freeze
  3. BOQ and cost plan
  4. Contract
  5. Mobilization
  6. Procurement and material submittals
  7. Construction with QA/QC and safety control
  8. Measurement and payment certification
  9. Testing and commissioning
  10. Snagging, as-built drawings and handover

Deliverables

  • MEP drawings and BOQ
  • Test and commissioning records

Documents normally requested

  • Approved / issued design set
  • Ownership or authorization evidence
  • Applicable approvals
  • Geotechnical / structural information where needed
  • Client specifications and budget

Copies only, through the secure method we send after your case is created.

Internal timeline

  • Design / BOQ timeline stated per scope

External dependencies

  • Authority approvals
  • Site access and utility connections
  • Client decisions on specification and variations

These are outside our control and are not part of our service-level targets.

Fees

Every engagement gets a written quotation with scope, deliverables, internal timeline, fee and exclusions before any work starts. Standard quotations are sent within 24 hours. Government and statutory fees, third-party professional fees and authority decision time are excluded unless the quotation says otherwise.

Related official resources

Regulatory information last reviewed: 26 October 2026. Always verify current authority requirements before submission.

More from Construction & Engineering

Start your case

Tell us the outcome you want. We will route your case to the right specialist.

A few more details (optional, helps us respond faster)

Please do not upload or paste identity or title documents here.

Thinking about a property? Verify it first.

Tell us the outcome you want — we open a case, name an owner and reply within 2 business hours.